Three weeks through 2.75 meters of destruction fill brought the team to the stone floor of the main room of a domestic structure in F9/F10. A doorway to the northwest is in situ, including the lintel stone. Except for one stone, the entire project was dug by hand. A tremendous credit to the team.

July 23, 2011
Domestic structure
0by Dr. Mark Schuler • 2011 • Tags: domestic structure, Hippos, NIP
Three weeks through 2.75 meters of destruction fill brought the team to the stone floor of the main room of a domestic structure in F9/F10. A doorway to the northwest is in situ, including the lintel stone. Except for one stone, the entire project was dug by hand. A tremendous credit to the team.